Expected and Achieved Results

On this page you can find the project's expected and achieved results (deliverables).

grass-1913167_1920

WP1 Requirements and Needs

Expected / Achieved results:

  1. Technical requirements
  2. Defined Use Cases, Target metrics and needs
  3. ZEFES ecosystem specification
  4. Supply chain mapping
  5. Supply chain needs
  6. Legal and administrative requirements
  7. Book of Recommendations

WP2 Design Optimisation of HD ZEV Powertrains

WP3 Advanced Fast Charging Concepts and Hydrogen Refuelling Stations (HRS) for BEV and FCEV

Expected / Achieved Results:

  1. Performance of the IMCS concept (VC11)
  2. Performance of the multiport MCS concept
  3. Conformance tests and guidelines for MCS norms
  4. Charging opportunity on a ferry/rail-wagon
  5. Mapping the HRS for HD FC trucks
  6. Mapping of charging stations

WP4 An Integrated (tool for a) Digital Twin of ZEV in Logistics Operations

Expected / Achieved Results:

  1. Digital twin and platform specification & architecture
  2. Infrastructure model/dataset (V2I Concept)
  3. Interfaces standard and tool
  4. Decision making platforms
  5. Process and outcomes of model validation

WP5 Modular and Efficient Long Haulage Battery Electric Vehicles (BEVs)

Expected / Achieved Results:

  1. System specification for ZE modular multipowertrain concepts
  2. Functional Safety Concept
  3. Powertrain components and control systems for next generation zero emission trucks
  4. Next generation battery electric trailers
  5. Commissioning, testing and verification connectivity BEV
  6. Realization and commissioning of all BEV demonstrators

WP6 Modular and efficient long haulage Fuel Cell Electric Vehicles (FCEVs)

Expected / Achieved Results:

  1. Simulation performance of FCEV demonstrators
  2. Commissioning, testing and verification connectivity FCEV
  3. Commissioning of all FCEV demonstrators

WP7 Demonstrations & Fleet Integration/Management in National & Cross-border Missions

Expected / Achieved Results:

  1. Use case menu card
  2. Overview performed use cases
  3. Technologies direct comparison

WP8 Use-case Evaluation, Impact Assessment and LCA

Expected / Achieved Results:

  1. Assessment framework
  2. Base line assessment
  3. Use case evaluation
  4. Life-cycle analysis
  5. Impact assessment
  6. Pathways for significant price reductions

WP9 Communication, Dissemination and Exploitation Strategy and Stakeholder Involvement

Expected / Achieved Results:

  1. Corporate Identity
  2. Updated DCE plan
  3. Intermediate “Results Ownership List”
  4. Results Ownership List

WP10 Project Coordination and Management

Project progress
Coordination