Expected and Achieved Results
On this page you can find the project's expected and achieved results (deliverables).
WP1 Requirements and Needs
Expected / Achieved results:
- Technical requirements
- Defined Use Cases, Target metrics and needs
- ZEFES ecosystem specification
- Supply chain mapping
- Supply chain needs
- Legal and administrative requirements
- Book of Recommendations
WP2 Design Optimisation of HD ZEV Powertrains
Expected / Achieved results:
- Vehicle simulation platforms
- Design optimization tool and right powertrain components’ sizing
- Feasibility study on new vehicle flexible concepts
- Fuel cell durability system studies
- Thermal management optimization for BEV and FCEV
- Design of the interface between b-trailer and prime mover
- Design of the interface between e-trailer and prime mover
WP3 Advanced Fast Charging Concepts and Hydrogen Refuelling Stations (HRS) for BEV and FCEV
Expected / Achieved Results:
- Performance of the IMCS concept (VC11)
- Performance of the multiport MCS concept
- Conformance tests and guidelines for MCS norms
- Charging opportunity on a ferry/rail-wagon
- Mapping the HRS for HD FC trucks
- Mapping of charging stations
WP4 An Integrated (tool for a) Digital Twin of ZEV in Logistics Operations
Expected / Achieved Results:
- Digital twin and platform specification & architecture
- Infrastructure model/dataset (V2I Concept)
- Interfaces standard and tool
- Decision making platforms
- Process and outcomes of model validation
WP5 Modular and Efficient Long Haulage Battery Electric Vehicles (BEVs)
Expected / Achieved Results:
- System specification for ZE modular multipowertrain concepts
- Functional Safety Concept
- Powertrain components and control systems for next generation zero emission trucks
- Next generation battery electric trailers
- Commissioning, testing and verification connectivity BEV
- Realization and commissioning of all BEV demonstrators
WP6 Modular and efficient long haulage Fuel Cell Electric Vehicles (FCEVs)
Expected / Achieved Results:
- Simulation performance of FCEV demonstrators
- Commissioning, testing and verification connectivity FCEV
- Commissioning of all FCEV demonstrators
WP7 Demonstrations & Fleet Integration/Management in National & Cross-border Missions
Expected / Achieved Results:
- Use case menu card
- Overview performed use cases
- Technologies direct comparison
WP8 Use-case Evaluation, Impact Assessment and LCA
Expected / Achieved Results:
- Assessment framework
- Base line assessment
- Use case evaluation
- Life-cycle analysis
- Impact assessment
- Pathways for significant price reductions
WP9 Communication, Dissemination and Exploitation Strategy and Stakeholder Involvement
Expected / Achieved Results:
- Corporate Identity
- Updated DCE plan
- Intermediate “Results Ownership List”
- Results Ownership List
WP10 Project Coordination and Management
Expected / Achieved Results:
- Project Handbook
- Initial Data Management Plan
- Quality Assurance and review procedure
- Risk Management Plan (RMP)
- Final Data Management Plan